
Frameless Shower Doors in Annapolis, MD
Anne Arundel County · measured and installed by our own crews
Annapolis is a growing share of our work, and it is a particular kind of job. The historic district has houses that predate plumb walls by two centuries, and the water side of town has newer builds where the primary bath is the whole point of the floor.
Salt air is the other thing that separates Annapolis from the rest of our territory. Hardware finish matters more here than it does inland, and it is worth talking through at the field measure rather than picking from a chart.
Recent Installs in Annapolis
We work regularly in Eastport, Murray Hill, West Annapolis, Admiral Heights, Hillsmere Shores and Bay Ridge.

How It Works
Quote and field measure
Send us your photos or plans. We will send you a quote and schedule a field measurement appointment.
Shop drawing and approval
We will send you your final design, with any optional upgrades, for approval.
Fabrication and installation
Once approved, your glass goes straight into production. Once it has passed quality inspection, we schedule the install.
Glass Services We Offer for Annapolis Homes
Typical project in Annapolis
$1,500 to $3,500
Installed, for most residential frameless shower doors. The size of the opening, the glass and the hardware finish all move the number.
Annapolis Questions
Which hardware holds up near the water in Annapolis?
Solid brass and bronze hold up best in salt air, and our Regal Series is solid brass throughout rather than plated. Plated finishes can pit over time within a few blocks of the water. We will tell you at the measure which way to go for your address.
How much does a frameless shower door cost in Annapolis?
Most residential frameless shower doors run between $1,500 and $3,500 installed. The size of the opening, the glass you choose and the hardware finish all move the number. Projects with more than one door qualify for volume discounts based on the total scope of work.
How long does it take?
Typically 7 to 10 days from final approval, once the shop drawing and hardware selections have been signed off.







