
Frameless Shower Doors in Baltimore, MD
Baltimore City and Baltimore County · measured and installed by our own crews
Baltimore is two different jobs depending on the address. In Canton and Fells Point we are usually working in a rowhouse bath where every inch is accounted for, and the answer is often a pivot door or a notched panel rather than a full swing.
North and west of the city, in Pikesville, Greenwood, Mount Washington and out toward Garrison, the baths are larger and the work is closer to what we do in Montgomery County: in-line panels, floor to ceiling glass, steam enclosures with a transom.
Recent Installs in Baltimore
We work regularly in Canton, Fells Point, Mount Washington, Cheswolde, Pikesville, Milford Mill, Garrison and Ilchester.

How It Works
Quote and field measure
Send us your photos or plans. We will send you a quote and schedule a field measurement appointment.
Shop drawing and approval
We will send you your final design, with any optional upgrades, for approval.
Fabrication and installation
Once approved, your glass goes straight into production. Once it has passed quality inspection, we schedule the install.
Glass Services We Offer for Baltimore Homes
Typical project in Baltimore
$1,500 to $3,500
Installed, for most residential frameless shower doors. The size of the opening, the glass and the hardware finish all move the number.
Baltimore Questions
Can you fit frameless glass in a Baltimore rowhouse bath?
Yes, and it is a good share of our city work. A rowhouse bath rarely has the floor clearance for a door that swings wide, so we template the opening and go with a pivot door or a notched in-line panel that works inside the footprint you have.
How much does a frameless shower door cost in Baltimore?
Most residential frameless shower doors run between $1,500 and $3,500 installed. The size of the opening, the glass you choose and the hardware finish all move the number. Projects with more than one door qualify for volume discounts based on the total scope of work.
How long does it take?
Typically 7 to 10 days from final approval, once the shop drawing and hardware selections have been signed off.







