
Frameless Shower Doors in Ellicott City, MD
Howard County · measured and installed by our own crews
Ellicott City splits cleanly in two for us. The historic district down by the Patapsco is stone, narrow and old, and nothing in it is square. Everything west of Route 29 is subdivision work from the eighties onward, where the baths are bigger and the walls behave.
Both get the same treatment: we template after the tile is in rather than working from a plan. In the historic part that is the only way it works at all. Out in the newer neighborhoods it is what keeps the reveal even across a long panel.
Recent Installs in Ellicott City
We work regularly in Historic Ellicott City, Font Hill, Dunloggin, Valley Mede, Eldersburg and Columbia.

How It Works
Quote and field measure
Send us your photos or plans. We will send you a quote and schedule a field measurement appointment.
Shop drawing and approval
We will send you your final design, with any optional upgrades, for approval.
Fabrication and installation
Once approved, your glass goes straight into production. Once it has passed quality inspection, we schedule the install.
Glass Services We Offer for Ellicott City Homes
Typical project in Ellicott City
$1,500 to $3,500
Installed, for most residential frameless shower doors. The size of the opening, the glass and the hardware finish all move the number.
Ellicott City Questions
Do you work in historic Ellicott City?
We do, and it is some of the most careful work we take on. Stone and plaster walls in the old district are never plumb, so the glass gets cut to the opening as it stands. Nothing is ordered before we have measured it ourselves.
How much does a frameless shower door cost in Ellicott City?
Most residential frameless shower doors run between $1,500 and $3,500 installed. The size of the opening, the glass you choose and the hardware finish all move the number. Projects with more than one door qualify for volume discounts based on the total scope of work.
How long does it take?
Typically 7 to 10 days from final approval, once the shop drawing and hardware selections have been signed off.







