
Frameless Shower Doors in Gaithersburg, MD
Montgomery County · measured and installed by our own crews
Gaithersburg is close enough to the shop that we are often there and back in a day, which matters for a field measure. It is also where we fit more of our Titan Series hardware than almost anywhere else: satin brass, matte black and brushed bronze all show up in the photographs below.
The upper county work runs from Gaithersburg out through Germantown, Laytonsville and Olney. Primary baths in the newer subdivisions, the occasional wine cellar, and a fair number of sliders where the bath was laid out before anyone thought about a shower door.
Recent Installs in Gaithersburg
We work regularly in Kentlands, Quince Orchard, Germantown, Olney, Laytonsville and Washingtonian.

How It Works
Quote and field measure
Send us your photos or plans. We will send you a quote and schedule a field measurement appointment.
Shop drawing and approval
We will send you your final design, with any optional upgrades, for approval.
Fabrication and installation
Once approved, your glass goes straight into production. Once it has passed quality inspection, we schedule the install.
Glass Services We Offer for Gaithersburg Homes
Typical project in Gaithersburg
$1,500 to $3,500
Installed, for most residential frameless shower doors. The size of the opening, the glass and the hardware finish all move the number.
Gaithersburg Questions
Which hardware finishes do you stock for Gaithersburg jobs?
All of them, and we bring samples to the field measure. Satin brass, matte black, brushed bronze, polished chrome and brushed nickel are the finishes we fit most. The finish is chosen before the shop drawing goes out for approval, not after.
How much does a frameless shower door cost in Gaithersburg?
Most residential frameless shower doors run between $1,500 and $3,500 installed. The size of the opening, the glass you choose and the hardware finish all move the number. Projects with more than one door qualify for volume discounts based on the total scope of work.
How long does it take?
Typically 7 to 10 days from final approval, once the shop drawing and hardware selections have been signed off.







