
Frameless Shower Doors in Silver Spring, MD
Montgomery County · measured and installed by our own crews
Silver Spring is older housing stock for the most part, and a lot of our work here is a bath that has not been touched since it was built. Takoma Park bungalows and Woodside colonials both tend to have a small square bath with a tub, and a frameless panel or a slider is what fits.
Sloped and angled ceilings turn up here more than anywhere else we work. A shower under a dormer needs the glass cut to the slope, which is a template job rather than a catalog order, and it is one of the more satisfying things we make.
Recent Installs in Silver Spring
We work regularly in Downtown Silver Spring, Takoma Park, Woodside, Four Corners, Chevy Chase and Forest Glen.

How It Works
Quote and field measure
Send us your photos or plans. We will send you a quote and schedule a field measurement appointment.
Shop drawing and approval
We will send you your final design, with any optional upgrades, for approval.
Fabrication and installation
Once approved, your glass goes straight into production. Once it has passed quality inspection, we schedule the install.
Glass Services We Offer for Silver Spring Homes
Typical project in Silver Spring
$1,500 to $3,500
Installed, for most residential frameless shower doors. The size of the opening, the glass and the hardware finish all move the number.
Silver Spring Questions
Can you make glass for a shower with a sloped ceiling?
Yes, and we do it often in Silver Spring. The panel is cut to the angle of the ceiling from a template taken on site. It cannot be done from a measurement over the phone, which is why the field measure matters more on these than on anything else.
How much does a frameless shower door cost in Silver Spring?
Most residential frameless shower doors run between $1,500 and $3,500 installed. The size of the opening, the glass you choose and the hardware finish all move the number. Projects with more than one door qualify for volume discounts based on the total scope of work.
How long does it take?
Typically 7 to 10 days from final approval, once the shop drawing and hardware selections have been signed off.







