
Frameless Shower Doors in Dupont Circle, DC
Northwest Washington · measured and installed by our own crews
D.C. rowhouse work is its own discipline. Baths in Dupont Circle, Bloomingdale and Kingman Park are often carved out of what used to be another room, and the opening is whatever the house allowed. We template every one of them.
Access is the other half of the job. Glass has to come up a narrow stair or through a front door with a turn behind it, and panel sizes get planned around that at the measure rather than discovered on install day.
Recent Installs in Dupont Circle
We work regularly in Dupont Circle, Cleveland Park, Kingman Park, Bloomingdale, Mount Pleasant and Tenleytown.

How It Works
Quote and field measure
Send us your photos or plans. We will send you a quote and schedule a field measurement appointment.
Shop drawing and approval
We will send you your final design, with any optional upgrades, for approval.
Fabrication and installation
Once approved, your glass goes straight into production. Once it has passed quality inspection, we schedule the install.
Glass Services We Offer for Dupont Circle Homes
Typical project in Dupont Circle
$1,500 to $3,500
Installed, for most residential frameless shower doors. The size of the opening, the glass and the hardware finish all move the number.
We also work nearby
- Logan Circle
- Georgetown
- Cleveland Park
- Columbia Heights
- Woodley Park
- Capitol Hill
Dupont Circle Questions
Can you get glass into a D.C. rowhouse?
Yes, and we plan for it. We check the stair, the turns and the door width at the field measure, and size the panels so they will physically reach the bathroom. It is the most common reason a job goes wrong when someone else has measured it.
How much does a frameless shower door cost in Dupont Circle?
Most residential frameless shower doors run between $1,500 and $3,500 installed. The size of the opening, the glass you choose and the hardware finish all move the number. Projects with more than one door qualify for volume discounts based on the total scope of work.
How long does it take?
Typically 7 to 10 days from final approval, once the shop drawing and hardware selections have been signed off.







