Our shower door process is straightforward: quote and field measure, final drawing approval, then production and installation. The usual lead time from final approval to installation is 7–10 days, depending on order volume, with the approved deposit needed to start production.
For a typical project, plan on a field-measure visit and a separate installation visit. After installation, the shower door must remain untouched and unused for 48 hours while the silicone cures.
Here is what happens between the first conversation and your finished shower.
Start with photos, dimensions, or plans
You do not need a finished bathroom to ask for a quote. Send us photos of the opening, approximate dimensions, or construction plans. Include any ideas you already have for the glass, hardware finish, and door layout.
If you are replacing an existing enclosure, a photo of the full unit helps us understand what is being removed and what will remain. We typically include removal and disposal at no extra cost.
Our pricing includes measurement, fabrication, delivery, installation, standard clear tempered glass, high-quality hardware, and warranty coverage. Optional glass and hardware upgrades are listed separately so you can decide which ones you want.
If the project includes several showers or custom mirrors, send the full scope together. It is easier to coordinate the work when we know about all of it at the beginning.
When should you contact us during a remodel?
Contact us while the bathroom is being planned, especially if you want a steam enclosure, a large fixed panel, or glass around a bench or knee wall.
The glass may be one of the last things installed, but its layout can affect decisions made much earlier. Hinge locations, support, curb details, and the relationship between the glass and tile should be considered before those details are difficult to change.
An early conversation does not mean measuring unfinished walls for production. We can discuss the design first, then schedule final measurement when the relevant tile, stone, and mounting surfaces are complete.
If tile is still underway, tell us the schedule. We can work out when the opening will be ready to measure rather than asking you to guess.
What happens at the field measure?
We check the actual opening and the conditions around it. That includes dimensions at the relevant points, wall alignment, angles, the curb, and any bench or knee wall the glass needs to follow.
We also consider how the door will operate. A door can fit the opening and still conflict with a vanity handle or towel bar when it swings. Those are problems to catch at measurement, not after fabrication.
The bathroom and route to it should be accessible. Let us know about parking restrictions, stairs, tight turns, or other access conditions that may affect delivery of a large panel.
The time needed for measurement depends on the number of enclosures and the complexity of the openings. We can discuss the appointment with you when scheduling.
Why can't the glass just be ordered from the plans?
Plans describe the intended bathroom. Field measurements describe the finished one.
Tile thickness, stone overhangs, wall alignment, and small construction changes can all affect the final dimensions. Even a straightforward rectangular opening may vary between the bottom and top.
Tempered shower glass cannot be trimmed on installation day to make an incorrect size fit. Its shape, holes, and hardware cutouts must be determined before tempering. That is why final measurements and drawing approval are part of the process.
Review and approve the shop drawing
After field measurement, you receive a detailed shop drawing for approval. This is your opportunity to review the enclosure layout, door position, glass selection, hardware, and other specified details before production.
Look at the drawing alongside your selections. Confirm that the door is where you expect it, the finish is correct, and the glass options match what you discussed with us. If something is unclear, ask before approving.
Changes can be reviewed at this stage, although some may affect price or require another measurement. Once glass has been fabricated and tempered, changing its size or cutouts means making new glass.
Our deposit is typically 40% and is due only after the final shop drawings are approved. The deposit moves the glass into production.
Fabrication and quality inspection
We partner with leading glass manufacturers to produce the tempered glass for our enclosures. The glass is fabricated to the approved specifications and passes through a rigorous quality inspection before moving on to installation.
This stage is why a custom enclosure is not simply a product selected from a shelf. The pieces are made for your shower, with the dimensions and preparation required for the chosen hardware.
Our typical approval-to-installation window is 7–10 days, depending on volume at the time of the order. We confirm scheduling for the actual project rather than treating that estimate as a guaranteed date for every enclosure.
Installation day
Before the appointment, clear toiletries and loose items from the shower and keep the route into the bathroom available. If other trades are still working nearby, coordinate access so the glass installation has the space it needs.
Installation involves positioning the glass, attaching the specified hardware and supports, fitting the door, and sealing the appropriate fixed joints. The door needs to operate correctly with the intended clearances and seals.
Mounting hardware can involve drilling, so installation is not a dust-free activity. An existing enclosure may also leave old sealant, mounting holes, or marks when removed. We need to assess those conditions; a new enclosure does not necessarily cover every trace of the old one.
The length of the appointment depends on the layout, access, and any removal work. A straightforward replacement and a custom steam enclosure should not be expected to take the same amount of time. Ask us about the schedule for your particular job.
The remaining balance, plus any selected glass or hardware upgrades, is collected upon completion of installation.
Leave the door alone for 48 hours
We leave a notice at every shower installation asking you not to touch or use the shower door for 48 hours. Allow for that waiting period when planning when the bathroom will be available.
That includes trying the door, using the shower, or cleaning around fresh silicone. Follow the notice left by the installation team.
Mirror installations have a different waiting period. We typically leave a notice asking that the mirror remain untouched for 7–10 days to allow its adhesive to cure.
What if something changes after measurement?
Tell us immediately if tile is replaced, a bench cap changes, or another detail affecting the glass is altered after we measure. We need to determine whether the drawing and dimensions still apply before production proceeds.
If a condition on site prevents the enclosure from being installed properly, the next step is to identify the cause and agree on the correction. Depending on the issue, that may involve remeasurement, fabrication changes, or work by the responsible trade. Forcing glass into an opening is not a solution.
Ready to get started? Send ShowerDoorKing your photos or plans. For help planning the budget first, read our frameless shower door cost guide.